Tuesday, 7 September 2010

Much progress, much rain!

We made a fairly early start this morning, leaving Gailey about nine. As we had about nine miles before the first lock I got on with the washing as we went along. We had a slight worry about the engine as we were smoking more than normal and also running a bit hot. Ray moored briefly to check things but couldn't find any obvious problems so we carried on to Autherley Junction where we stopped for lunch. I walked up to Morrisons for some bread and milk in brilliant sunshine and walked back in pouring rain! Our lunch stop was a little longer than planned as we sat out a storm, including thunder!

When the rain eased off we carried on southwards in alternating sunshine and showers until we reached Awbridge Lock where we have moored for the night.



Circular weir at Awbridge Lock




Bridge with a gap in the middle for the rope to pull a butty into the lock





Today's journey 13.8 miles and 6 locks

So far we have travelled 603 miles, 525 locks, 53 swing bridges, 4 lift bridges and 15 tunnels

No comments:

Post a Comment