Today we did an about turn to head back to the canal system. Luckily what wind there was, was mainly from behind us and the current was not running too fast. It was still a long haul from Chaceley up to Worcester, we managed about three miles an hour upstream compared to the six we were doing downstream. We were a little concerned about how well Morgana's engine would cope with the hard work against the current but she behaved beautifully.
We enjoyed a pleasant, warm day cruising up the Severn, with very little traffic on the river. At Worcester we turned onto the Worcester and Birmingham Canal which we will follow northwards to join the Birmingham Canal Network. After that it will be back to Wolverhampton and then the Shroppie Union for the winter. Nearly time to rescue my car from Mandy's drive and look for work. Summer has gone far too quickly.
Today's journey 19.3 miles and 4 locks
So far we have travelled 674.2 miles, 561 locks, 53 swing bridges, 4 lift bridges and 17 tunnels
Monday, 20 September 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment