Monday 23 March 2015

Gnosall

We made a later start today and didn't set off until about ten. After yesterday I was aching a lot. too much hard work after a lazy winter. We are trying to make as much progress as is reasonable as the weather forecast for later in the week and early next week isn't good. If we can leave ourselves with as little travelling as possible in case the weather does turn nasty that would be good.

It was overcast and chilly today and there is a chance of frost tonight. We made our way to Wheaton Aston where we topped up the diesel and got another gas cylinder then it was onward to Gnosall in light drizzle.

I've wrapped my plants in fleece for tonight, just in case. if the weather holds tomorrow we might make it as far as Tyrley Wharf, we will see what the morning brings.

Today's journey 9.4 miles, 1 lock and 1 tunnel

This year we have travelled  25.5 miles, 34 locks and 3 tunnels

In 2014 we travelled 425 miles, 334 locks, 2 swing bridges,17 lift bridges and 23 tunnels

In 2013 we travelled 459.1 miles, 434 locks, 7 swing bridges, 15 lift bridges and 31 tunnels

In 2012 we travelled 876.9 miles, 675 locks,  55 swing bridges, 22 lift bridges and 31 tunnels

In 2011 we travelled 461.4 miles, 444 locks, 3 swing bridges, 34 lift bridges and 15 tunnels

During 2010 we travelled 740.3 miles, 642 locks, 53 swing bridges, 4 lift bridges and 25 tunnels

Since Ray retired we have travelled 2988.2 miles, 2563 locks, 120 swing bridges, 92 lift bridges and 128 tunnels

No comments:

Post a Comment