Friday, 18 April 2014

At Alvecote

I've got out off the habit of blogging during our time off, time to catch up again.

We took a day off on Sunday, Ray wasn't feeling his best and it was very windy so we stayed where we were. On Monday we carried on through the last four Curdworth locks to the junction at Fazeley where we took a slight detour by heading away from Alvecote so that we could moor within walking distance of the shops. As we approached our mooring we saw Paul(of PJ Fenders) walking Patch, he stopped to help us moor then went back to his boat to fetch Jennie. After a couple of cuppas and a natter they headed home and we got ourselves sorted to go shopping. Then on the way back from shopping we stopped for a coffee with them, it's a hard life this boating lark!

On Tuesday we headed back the way we had come as far as the junction to meet up with Ali and Lou on Da Vinci and Lowry and Sandra on Golden Boyz,so with Paul and Jennie that made five boats heading for Alvecote. On Wednesday we headed for the marina apart from Sandra who was doing some good trading where she was so she joined us yesterday.

The weather forecast is pretty good for today and tomorrow but not so good Sunday and Monday,I've spent far too much time nattering to Ali and Lou but I have got a few more bits made. Hopefully we will have a good weekend.

Since my last post we have travelled 9.3 miles and 6 locks

This year we have travelled 25.6 miles, 29 locks and 1 tunnel

In 2013 we travelled 459.1 miles, 434 locks, 7 swing bridges, 15 lift bridges and 31 tunnels

In 2012 we travelled 876.9 miles, 675 locks,  55 swing bridges, 23 lift bridges and 31 tunnels

In 2011 we travelled 461.4 miles, 444 locks, 3 swing bridges, 34 lift bridges and 15 tunnels

During 2010 we travelled 740.3 miles, 642 locks, 53 swing bridges, 4 lift bridges and 25 tunnels

Since Ray retired we have travelled 2563.3 miles, 2227 locks, 118 swing bridges, 76 lift bridges and 103 tunnels

No comments:

Post a Comment