Monday, 22 June 2015

A late start

Ray woke up this morning with a headache so we had a bit of a late start. Keri and Dan left early but they had shopping to do so we expected to catch up with them. When we did get moving we had a fairly easy journey but the canal was busy.

It was a rather windy day which always makes life interesting but apart from a close encounter at Barbridge Junction all went well, even that wasn't a panic situation.

We spotted Keri and Dan's boat moored at Nantwich and as we were crossing the aqueduct we saw them walking back from town. They spotted us too and there was much waving and calling!

We had decided we wanted to reach Coole Pilate which gives us a longish but manageable day to reach Market Drayton tomorrow. We were beginning to think that Keri and Dan had decided to stop at Nantwich but they arrived eventually. They had been delayed because George, their Gordon Setter had to go to the vet. He has an abscess under a tooth, poor thing.

Earlyish start tomorrow with lots of locks.


Today's journey 15.3 miles and 4 locks

This year we have travelled  264.9 miles, 247 locks, 3 swing bridges and 8 tunnels

In 2014 we travelled 425 miles, 334 locks, 2 swing bridges,17 lift bridges and 23 tunnels

In 2013 we travelled 459.1 miles, 434 locks, 7 swing bridges, 15 lift bridges and 31 tunnels

In 2012 we travelled 876.9 miles, 675 locks,  55 swing bridges, 22 lift bridges and 31 tunnels

In 2011 we travelled 461.4 miles, 444 locks, 3 swing bridges, 34 lift bridges and 15 tunnels

During 2010 we travelled 740.3 miles, 642 locks, 53 swing bridges, 4 lift bridges and 25 tunnels

Since Ray retired we have travelled 3216 miles, 2776 locks, 121 swing bridges, 92 lift bridges and 133 tunnels

No comments:

Post a Comment